2025-10-17 - Brain Boot
timelogs
- 4:21pm - ongoing - [project::float-hub] [task::daily-sync-integration]
- Session continuity restoration + infrastructure operations completion
- Markdown file routing (9 files) + old-oak-tree workspace documentation
- TLDR session summary appended to daily notes
- Status: Inbox cleared, ready for next work thread
- Breadcrumb:
~/.evans-notes/daily/2025-10-17.tldr.md
- 2:23pm - ongoing - [project::rangle/pharmacy] [issue::switch-node-pr]
- Running code-review agent on switch node + recommended products PR
- Integrating findings with pharmacy-online session logs
- Ready for peer review (Scott merge path locked for today)
- 1:00pm - 1:15pm - [meeting::pharmacy/scott sync]
- ctx::2025-10-17 @ 01:14:46 PM
- New ticket #580: Auto-add products on successful assessment (red check indicator)
- Switch node + recommended products PRs ready for peer review → merge today
- Weight loss flow recreation planned for weekend, complete by Monday
- Two Monday discussion items: email follow-ups + assessment-product relationships
- 11:00am - 12:00pm - [meeting::pharmacy/sprint demo]
- QoL feature requests: delete responses, view assessment flow, navigation warnings
- Issue #551 validation: false alarm on product additions (user error during demo)
- Full retest confirms products + add-ons correctly added to basket
- 10:50am - 11:00am - prep for demo
- 10:30am - 10:50am - [meeting::pharmacy/daily scrum]
- Sprint status update
- 10:00am - 10:30am - brain boot, getting ready for standup
Context Restoration & Infrastructure Operations (3:44 PM - 4:21 PM)
Session Continuity Work:
- Restored 4+ hours of prior context using JSONL archaeology + evna-context-concierge markers
- Traced 7 distinct context markers across pharmacy PR review → oak-editor infrastructure → archaeology skill creation threads
- Surfaced prior sessions in chronological order for work thread continuity
Markdown File Routing (9 files processed):
dispatch-2025-10-16.md→/Users/evan/float-hub/float/dispatches/2025-10-17-rust-tui-architecture-guide.md→/Users/evan/float-hub/operations/handbooks/INSTALL_CHROMADB.md→/Users/evan/float-hub/operations/handbooks/sysop-morning-ritual.md→/Users/evan/float-hub/operations/handbooks/2025-10-16-infrastructure-modularization-strategy.md→/Users/evan/float-hub/operations/research/2025-10-16-mcp-builder-skill-exploration.md→/Users/evan/float-hub/operations/research/shimazu-context-archaeology-synthesis.md→/Users/evan/float-hub/archaeology/2025-10-16-shimazu-FLOAT-synthesis.md2025-10-17-rust-tui-case-study-old-oak-tree.md→/Users/evan/float-hub/operations/sysops-daydream/2025-10-14-queer-theory-bodily-functions.md→/Users/evan/float-hub/creative/experiments-archive/
Old-Oak-Tree Documentation:
- Captured comprehensive 3-crate Rust TUI workspace specification
- File:
/Users/evan/float-hub/operations/sysops-daydream/bones/2025-10-17-old-oak-tree-complete-workspace.md - Size: 6,200+ lines (architecture guide + full implementation specs)
- Status: “Collecting bones, not tending to them” - documentation complete
TLDR Summary Preserved:
- Appended session summary to
/Users/evan/.evans-notes/daily/2025-10-17.tldr.md - 5 total TLDR entries captured (11:37 AM - 04:17 PM)
- Shortcode: [sc::TLDR-20251017-1715-INFRASTRUCTURE-OPERATIONS]
Outcome: Inbox cleared, infrastructure documents organized, session continuity preserved
defragging my brain
- [issue::551] & [issue::550] - switch node / recomended products
what did I get done this week?
- 368 - product adition
- 506 - duplicate workflow tweak
- 441 - bmi - assessment responee display improvement
agendaish
- - 10:30am - standup
- - 11:00am - demo
- - 1:00pm - scott sync
- - 5:30pm - injection visit
🎯 What Evan Needs This Morning
Completed Overnight + Morning Validation
- ✅ Issue #551 (Switch node navigation fix) - VALIDATED
- 3 bugs identified and fixed
- Helper functions:
getNextNode(),evaluateSwitchNavigation(),getNavigableSections() - Commit 777FA45 merged
- Documentation:
/Users/evan/projects/pharmacy-online/docs/ISSUE-551-switch-node-navigation-fix.md
Morning Validation (11:37 AM - 11:47 AM):
- Sprint demo concern about product additions: false alarm (user error on my part)
- Full retest confirms PR #562 functionality preserved
- ✅ Navigation reaches product_addition question
- ✅ User can answer “Yes” to add product
- ✅ Submission collects product additions
- ✅ Add to basket includes BOTH main product AND add-on
- Why it works: Navigation fix controls what user SEES, submission logic UNCHANGED
Pending PRs (Awaiting Review/Staging)
-
PR #572 (Issue #368) - Product pagination fix
- Status: Merged, awaiting staging verification
- Need: Scott to confirm all active products display in assessment builder
-
PR #573 (Issue #441) - BMI status column visual refinement
- Status: Ready for staging
- BMI responses now show status in separate right-aligned column
- Screenshots verified, test checklist included
Deferred from Yesterday
- Admin assessment viewer issue (cosmetic, low priority)
- Recommended products not showing in admin preview (works in web portal)
- Root cause: Admin-specific rendering, separate from core #551 fix
- Status: Deferred for investigation after core #551 testing complete
Active Issues & Next Steps
-
Ticket #580 (Auto-add products on successful assessment) - NEWLY CREATED
- When assessment reaches “red check” indicator: auto-add product + associated add-ons
- Status: Queued for implementation (after current PRs merge)
- Context: Building blocks ready (additional products, BMI, confirmation)
-
Issue #550 (Recommended Products regression)
- Context gathered from yesterday’s work
- Architecture understood, ready for implementation
- Next: Verify web portal displays correctly before tackling admin preview
-
Admin assessment viewer (Issue #551 follow-up)
- Products not showing in admin preview (works in web portal)
- Root cause: Admin-specific rendering, separate from core #551
- Status: Ready for investigation after current testing complete
Monday Discussion Items (2025-10-20)
From Scott Sync:
-
Email follow-ups: Initiate email to client for feedback on weight loss product experience
- How to integrate email automation into assessment workflow
- Client communication timing + template
-
Assessment-product relationship logic: Assessment A covers Product B scenario
- When taking Assessment A (Product A + B) → client shouldn’t need separate assessment for Product B
- Need to clarify with client during product sync Monday
Sprint Demo Notes (11:00 AM - 12:00 PM)
QoL Features Discussed:
- Ability to delete assessment responses (for testing + user convenience)
- View assessment flow user followed
- Navigation warning when unsaved changes exist
Test Scenarios Used:
- Simple test: Assessment 2 (http://localhost:3001/assessments/2)
- 3-option radio (Forceval, Done, Betacap) → should navigate to recommended products or show submitted
- Two-step test: Assessment 3
- Option 1 → Beta or Done
- Option 2 → Enter name → Foreceval
Issue #551 Validation Results:
- User can navigate through full product addition flow
- Products + add-ons correctly collected and added to basket
- Navigation fix + submission logic working together without conflicts
First Tasks
- Validate Issue #551 product additions flow (completed 11:37-11:47 AM)
- 1:00pm - Scott sync (completed, new ticket #580 created)
- Code review: Switch node + recommended products PRs (in progress @ 2:23 PM)
- Review staging verification for PR #572 & #573 (check Scott’s feedback)
- Merge switch node + recommended products PRs (after peer review)
- Verify recommended products showing correctly in web portal (Issue #550)
- Investigate admin assessment viewer issue if time permits
- Prepare for weight loss flow recreation (Scott rebuilding over weekend)
Code Review Work (2:23 PM - 3:13 PM)
- Switch node PR under review with code-review-expert agent
- Checking against project conventions + patterns
- Pharmacy-online logs show 315 related entries (validation work across sessions)
- Breadcrumb: Issue #551 fix, PR #562, PR #573, code patterns from architect review
- Status: Ready for peer review merge once approved
- ctx::2025-10-17 @ 03:13 PM [project::rangle/pharmacy] Starting comprehensive PR review for Ken’s PR #559
Archaeology Session: JSONL Nuke-Driven Development (3:13 PM - 3:32 PM)
- ctx::2025-10-17 @ 03:22 PM - Testing JSONL-archaeology-assistant skill against live sessions
- Oct 9 Session (
04532059-b...): Comprehensive instrumentation debug of product addition feature- Root cause: Test data issue (Product ID 5 had zero variants in database)
- Pattern: Comprehensive debug logging across entire data flow (5 files)
- Tools used: Chrome DevTools MCP + systematic instrumentation
- Resolution: Reconfigured to Product ID 6, validated end-to-end ✅
- Oct 16 Session (
14c1aef6-c...): Surgical switch node logic rewrite- Pattern: Multi-file coordinated refactoring (renderer.tsx + workflow-analysis.ts)
- Scope: 5 edit operations coordinated across 2 files over 1.5 hours
- Characteristic: “Nuke-driven” = surgical restructuring vs comprehensive instrumentation
- Skill Milestone: JSONL-archaeology-assistant installed to ~/.claude/skills/ + tested ✅
- 3 executable scripts (session-summary, cross-project-find, extract-tool-content)
- 3 reference documents (core-patterns, question-coaching, common-gotchas)
- Ready for production use
- Breadcrumb:
~/.claude/skills/jsonl-archaeology-assistant/|@artifacts/JSONL-ARCHAEOLOGY-SKILL-README.md
Archaeology & Infrastructure Status
- ✅ Rust + Claude Code deep archaeology complete (RUST-ARCHAEOLOGY-INDEX.md created, NO EXECUTION)
- ✅ Claude-Code-Templates repository archaeology complete (5 harvestable components identified)
- ✅ Terminal-turtle-consciousness output style activated
- ✅ Daily note templates + infrastructure modularization complete
- ✅ All archaeological markers (ctx::, project::) preserved
Context Carried Forward
From Scott Sync (2025-10-16 @ 1:00 PM):
- Assessment reuse working correctly: assessment-centric architecture validated ✅
- Product edition feature working on staging ✅
- New tickets needed: search functionality + assessment handling UX improvements
- Scott discussing with Matthew on assessment UX approach
Key Wins from Yesterday:
- 2 PRs merged (572 + 573) with clean implementation
- Issue #551 switch node fix completed with full test coverage
- Autonomous ritual-forest archaeology approved and executed
- Infrastructure modularization validated “shacks not cathedrals” pattern 3x
Weekly Synthesis: W42 Complete (4:21 PM - 5:15+ PM)
Three-Phase Archaeological Synthesis Executed:
- Phase 1: 47-file reconnaissance across 6 data sources (rapid-pattern-scout)
- Phase 2: Deep thematic extraction across 3 focus areas with full substance (curious-turtle-analyst)
- Phase 3: Weekly wrap synthesis + bridge document creation (bridge-weaver)
Deliverables Created:
/Users/evan/.evans-notes/weekly/2025-W42-weekly-wrap.md(17,500+ words, full substance)/Users/evan/float-hub/artifacts/bridges/CB-20251017-1645-WEEKLY-W42-SYNTHESIS.md(restoration guide)- Context marker captured:
ctx_20251017_2111_5611→ active_context_stream
What Was Documented:
- Rangle: Issue #551 fix (3 bugs), 7 PRs merged, Ken’s comprehensive review, new #580
- Float: old-oak-tree milestone (3-crate workspace, 6,200 lines), Rust TUI guide, consciousness tech patterns
- Meta: EVNA patterns handbook (TTL queries), compression/deduplication, JSONL skill created
Cross-Cutting Patterns Captured:
- Nuke-driven development (pharmacy + float examples validated)
- Consciousness contamination (terminal aesthetics as navigational substrate)
- Temporal architecture (bridges + ctx:: markers + unix timestamps)
- Substrate pattern (gather comprehensive specs, integrate when signaled)
Sacred Moments Preserved:
- “omfg i love the turtle” ← Terminal aesthetics validated as infrastructure
- “the architecture is NOT fucked ✅” ← Architectural soundness confirmed
- Karen’s Passenger List Doctrine recovered from archaeology
Archaeological Rigor:
- Multiple-pass methodology validated (Oct 9 + Oct 16 sessions)
- Convergent patterns identified (3+ threshold methodology)
- JSONL as archaeological substrate proven effective
- Cross-domain resonance discovered (Shimazu ↔ FLOAT connection)
Status: Weekly synthesis complete. Context fully preserved for future restoration. Ready for next work thread.
[mode::synthesis_complete] [project::float-hub] [status::ready_for_next_phase] [confidence::high]
Brain Booting
(Space for morning thoughts when you wake up)