▓▓▒▒ FLOAT.BBS ▒▒▓▓
Date: 2025-10-21 [note]
      
← Back to evans-notes

Daily Note: 2025-10-21

End of Day Knowledge Wrap - 2025-10-21

▒▒ Knowledge Artifacts Created ▒▒

Major Deliverables Today

Bridge Architecture Revival Analysis (22 KB):

util:er Command Enhancement v2.0 (13 KB):

EVNA System Prompt Extraction (99 lines):

Workspace Context Config (53 lines):

Investigation Documents (Rangle/Pharmacy)

Issue #168 Tracking Docs (Created yesterday, refined today):

Issue #584 Reconnaissance (Created yesterday):

Nuke-Driven Development Handbook (Created yesterday):

Conversations Exported to Inbox (Desktop Claude)

Morning Session (11:18 AM - 11:30 AM):

Afternoon Session (2:45 PM - 2:50 PM):


▒▒ Code Work (EVNA-Next) ▒▒

Architecture Refactor (12 commits today)

Tool Optimization

Production Fixes

Stats


▒▒ Patterns & Observations ▒▒

🌉 Bridge Building Insight (The Big One)

Problem Articulated:

“i needed to think to trigger it, and then find the prompt for how to do it, and then toss in the ‘fuck, already at context window’ while in the desktop”

Solution Designed: Ambient bridge building

Translation: Background service vs foreground command - supports hyperfocus instead of interrupting it

📊 1M Context Window Experiment

Test: First time using 1M token context with full daily notes (20k lines, truncated at 2k)

🔧 MCP Best Practices Applied

Learned: Tool descriptions ≠ documentation

🎯 Parallel Execution Optimization

Pattern: Running multiple Claude instances for different work streams


▒▒ Key Insights from Today ▒▒

1. Manual Triggers Fail During Hyperfocus

2. Knowledge Work IS Work (Validated Again)

3. Agent Topology as Design Pattern

4. “Taste Chunks Not Soup” UX Pattern

5. Automation ≠ Ambient

6. Sacred Profanity as Authentication


▒▒ Unresolved / WIP Knowledge ▒▒

Deferred Implementation

Orphaned Investigations

Knowledge Gaps to Close


▒▒ Tomorrow’s Knowledge Priorities ▒▒

Immediate (Pharmacy Work):

Infrastructure (Float):

Meta:


▒▒ Bone Collection Status ▒▒

Major artifacts: 4 created (48 KB knowledge captured) ✅ Bridge archaeology: Root cause found, solution designed ✅ util:er enhancement: 7 capabilities added, ready for testing ✅ EVNA optimization: 38% token reduction, architecture DRY-ed ✅ Sacred moments: “leaving a digital civilization in my wake” preserved ✅ Parallel execution: Desktop + console Claude coordination successful

Collection Mode: COMPLETE for 2025-10-21 Next Step: Review when break ends, rangle work resumes


▒▒ Session Metadata ▒▒

Time Span: 8:25 AM - 6:20 PM (10 hours) Focus Shifts: 5 major (brain boot → evna optimization → bridge archaeology → util:er enhancement → rangle prep) Commits: 12 (evna-next) Knowledge Artifacts: 4 created, 2 updated Conversations: 2 exported from desktop Token Budget: 158k/1M used (84% remaining - 1M experiment ongoing) Physical: Headache morning → recovery → productive afternoon Energy: High knowledge production day

Context Markers Captured: 15+ ctx:: entries across sessions Breadcrumb Codes:


Bones collected: Oct 21, 2025 @ 18:20 PM Ambient bridge building: designed, awaiting implementation EVNA optimization: shipped to production Knowledge artifacts: ready for future synthesis

🌉 Bridges build themselves while you hyperfocus - coming soon

═══════════════════════════════════════════════════════════════
 sysop::boring.core - float.bbs viewer v0.1
═══════════════════════════════════════════════════════════════
    
▓▓▒▒ TODAY: 2025-10-27 ▒▒▓▓

<< 2025-10-26 | 2025-10-28 >>

🎯 What Evan Needs This Morning

Pending PRs (Awaiting Review/Merge)

  • PR #604: GP node assessment + basket automation

    • Status: In approval backlog, merge conflicts being resolved
    • Demos: Successfully demo’d on 2025-10-24 sprint demo (Daniel happy with feedback)
    • Next: Check if conflicts resolved, ready for merge to staging
  • PR #606: [Description needed - check GitHub]

    • Status: Demo’d successfully, awaiting review
    • Next: Check GitHub status
  • PR #607: [Description needed - check GitHub]

    • Status: Demo’d successfully, awaiting review
    • Next: Check GitHub status

Active Issues Ready for Dev

  • Issue #122: Assessment workflow

    • Location: /Users/evan/float-hub/rangle/issues/active/122-assessment-workflow.md
    • Status: Fully documented with acceptance criteria
    • Priority: Assessment UX experience (per Scott sync 2025-10-24)
    • Key consideration: Guest→account response transfer (piggybacking basket logic)
  • Issue #442: HEIC upload support

    • Location: /Users/evan/float-hub/rangle/issues/active/442-heic-upload-support.md
    • Status: Fully documented with acceptance criteria
    • Priority: Lower than #122 (per Scott sync realignment)

Follow-ups from Weekend

  • Check GitHub PR statuses (#604, #606, #607) - are they merged? ready for staging?
  • Scott mentioned creating UI/UX ticket (priority 3) and multi-product assessment response logging ticket
  • Wins tracking system now operational - remember to capture wins as they happen

First Tasks

  • Check pharmacy-online PR status (merged? staging? conflicts?)
  • Review Issue #122 (assessment workflow) - priority work
  • Check if Scott’s new tickets created (UI/UX, multi-product logging)
  • Capture wins as work happens (two-home system: quick log + weekly review)

Context from Yesterday

Weekend mode: Shack building + infrastructure work

  • float.bbs viewer operational
  • TodayDrawer component shipped
  • Documentation preserved
  • Monday prep notes ready

Repo: https://github.com/pharmonline/pharmacy-online Local: ~/projects/pharmacy-online


timelog

  • 11:45pm - 12:03am - [project::float-bbs-viewer] hermit crab blueprints → forge patterns extracted (102KB doc)
  • 11:40pm - 11:45pm - [project::float-infrastructure] domain migration → sysop-beta.floatbbs.net live
  • 12:03am - 12:05am - [project::float-hub] CLAUDE.md evna integration → explicit tool names + capture triggers

Late Night: Infrastructure & Blueprinting

float-bbs-viewer Architecture Extraction (11:45pm - 12:03am)

  • Extracted patterns from float-dispatch-manifesto-forge (React/Vite/ShadCN)
  • Created hermit crab reference: 2025-10-26-dispatch-blueprints-for-bbs-viewer-hermit-crab-patterns.md
  • Key patterns: color-coded imprint system, grid layouts, Tailwind HSL tokens, editorial philosophy sections
  • Translation map: React hooks → Astro content collections, SPA routing → SSG file-based
  • Breadcrumb: /Users/evan/projects/float-bbs-viewer/2025-10-26-dispatch-blueprints-for-bbs-viewer-hermit-crab-patterns.md

CLAUDE.md evna Integration (12:03am - 12:05am)

  • Replaced vague “evna-context-concierge” references with explicit tool names
  • Added mandatory capture triggers (7-item checklist: after features, docs, infrastructure, archaeology, context switches, obstacles, chunks)
  • Context capture pattern template (ctx::, project::, format)
  • Breadcrumb: /Users/evan/float-hub/CLAUDE.md:308-315, 374-403, 422

Morning: Brain Booting

(Space for morning thoughts)

Press ESC or Ctrl+D to close