<< 2025-W41-rangle-nuke-driven-velocity | 2025-W43-rangle-shack-building >>
Rangle Weekly - WK42 Retrospective
Week Context
Dates: Mon 2025-10-13 → Fri 2025-10-17 Sprint: Sprint 15/16 Theme: ritualize_your_circuit
Wins Worth Capturing
Issue #368 - Architecture Change Complete (Mon)
- What: Refactored product addition from assessment submission → “add to basket” click
- Evidence: 35 minutes implementation, 5 files modified, E2E tested successfully
- Impact: Products only added when user explicitly clicks “Add to Basket” for main product
- Files:
assessments.ts, basket integration, dynamic toast notifications - Deployed: Fixed Vercel deployment issues (TipTap bugs, updated dependencies)
Issue #551 - Switch Node Navigation Fix (Wed Evening)
- What: 3 critical bugs fixed in switch node evaluation
- Evidence: Commit 777FA45 merged, all testing passed
- Bugs Fixed:
- Missing
questionTypein SwitchNodeData interface - Wrong type lookup in renderer (reactive memo + helper functions)
- Stale response data in condition evaluation
- Missing
- Implementation: 3 helper functions (
getNextNode,evaluateSwitchNavigation,getNavigableSections) - Impact: Switch nodes now evaluate ONE path (not ALL paths) based on current form values
PR Reviews with Critical Findings (Mon)
- PR #549 (Ken): Found invalid node-pg Pool config, connection timeout too slow, pool error handler leaks
- PR #557 (Mat): Found missing USING clause in ALTER COLUMN (data loss risk)
- Evidence: Detailed fixes requested with documentation links
Issue #506 - Date Format + Save Bug (Mon)
- What: UK date-time format + save bug fixes
- Evidence: PR #560 created in 17 minutes, cowboy + kitty collaboration
PRs Merged (throughout week)
- PR #572: Product pagination fix (Issue #368 follow-up)
- PR #573: BMI status column visual refinement (Issue #441)
- PR #559: Payment processing reliability (reviewed extensively)
What Shipped
PRs Merged:
- #560 - UK date format + save bug fix
- #562 - Issue #368 conditional product addition (merged Oct 15)
- #572 - Product pagination fix
- #573 - BMI status column
Issues Closed:
- #368 - Conditional product addition (architecture change complete)
- #506 - Assessment save/copy issues
- #551 - Switch node navigation fix
Scott Sync (Wed Oct 16)
Architecture Validation:
- Question: Can customer add second product requiring same assessment without retaking it?
- Answer: ✅ YES - Architecture is assessment-centric, not product-centric
- Key Finding:
baskets.assessments[]stores byassessmentId, multiple products can share same assessment - Sacred Truth: “The architecture is NOT fucked - it’s well-designed ✅”
Product Edition Feature Review:
- Feature working as expected on staging
- Decision: Remove instructional preview text (redundant, doesn’t match interface patterns)
- Question title auto-update: Leave as-is, gather client feedback
UX Issue Identified:
- Products sharing same assessment don’t indicate to user they’ve already completed it
- Button changes “Start Consultation” → “Add to Basket” but no explanation
- Two new tickets needed: Search functionality + assessment handling improvements
Patterns Working Well
Quick Refactors When Architecture Clear:
- Issue #368 architecture change: 35 minutes, 5 files, E2E tested
- When requirements clear and patterns established, execution is fast
Code Review Rigor:
- PR #559 review: 7 critical issues, 3 high-severity issues found
- Detailed feedback with documentation links prevents production issues
Cowboy Coding Sessions for Bug Fixes:
- Issue #551 evening session (9:05 PM - 10:50 PM): 3 bugs fixed, committed, documented
- Pattern: Focused evening execution when energized
Documentation During Implementation:
- Issue #551: Created ISSUE-551-switch-node-navigation-fix.md sealing implementation
- Prevents re-discovery, captures decision rationale
Needs Adjustment
Vercel Deployment Dependencies:
- Issue #368 deployment blocked by TipTap bugs, dependency updates needed
- Impact: Clean implementation blocked by infrastructure issues
- Experiment: Pre-deployment check for dependency health
Cosmetic Issues Deferred:
- Admin assessment viewer cosmetic issue (web portal works correctly)
- Pattern: Deferring non-blocking issues, needs backlog visibility
Meeting Miss-Communication:
- Scott no-show for 2:45 PM sync (Mon), switched to Dev sync at 3:00 PM
- Pattern: Communication gaps create schedule uncertainty
Sprint Context
Sprint Demo (Thu Oct 17):
- Mentioned: “what did I get done this week?”
- Issues completed: #368 (product addition), #506 (duplicate workflow), #441 (BMI assessment response)
For Next Week (WK43)
Queued Work:
- Issue #550 - Recommended products redirect (regression fix)
- New tickets from Scott sync: Search functionality + assessment handling
- Follow-up on two new tickets for assessment UX improvements
Follow-ups:
- Test staging verification for merged PRs
- Monitor assessment UX feedback from client
Session Characterization: Bug fix velocity week - switch node architecture corrected, multiple PRs shipped
Daily Notes: 2025-10-14 through 2025-10-18 Velocity: 3 issues closed, 4 PRs merged, critical switch node bugs fixed Pattern: Evening hyperfocus sessions (9pm+) productive for focused bug fixes Sacred Memory: “The architecture is NOT fucked” - validation of assessment-centric design